ไดอะแฟรม LOGO.png

Heavy-duty Commercial Drain Pump Makes Renovations Possible

Revival Brewery Company offers a distinctive craft beer expertise that appeals to everyone. It is a renewal of brewmaster Sean Larkin’s ardour for unique and revolutionary craft beers, cultivated over twenty years of creating signature brews for the preeminent breweries in Rhode Island.
Though he’d been serious about striking out on his personal for a couple of years, it was an introduction to avid house brewer Owen Johnson in late 2009 that set in movement what would become Revival. After many nights of brainstorming, Revival Brewery Company determined to reinvent itself in a post-pandemic world with the timeless combination of beer and pizza. The owners created Revival Brewing and Lost Valley Pizza, a brewpub and pizzeria situated within the Valley neighborhood of Providence, Rhode Island.
After reopening the brewpub in a new building, the owners had various tasks lined as a lot as improve the space, together with extra bogs and a new bar area.
However, the brewery’s new location posed a troublesome plumbing scenario. According to Geoff O’Leary, owner of O’Leary Plumbing and Heating, they had originally planned to install conventional underground drain traces, however “during the initial construction of the brewery, they utilized an area with none plumbing plans obtainable, so we had no thought what the plumbing setup seemed like,” explains O’Leary.
“We knew there were drain traces in the flooring, but we didn’t know the place we wanted to install the restrooms or the bar area,” he continues. “We later realized the concrete was three feet thick, making any new plumbing installation notably tough and expensive.”

PROBLEM

Thankfully, O’Leary knew of a product he had been using over the complete span of his twenty-year plumbing profession: Saniflo’s above-floor plumbing pumps, a solution that would enable them to put in plumbing without needing to interrupt via that 3-inch-thick concrete to put in new drain traces.
“I’ve been utilizing pressure gauge of macerator pumps since it was first introduced in the United States,” says O’Leary, who serves the Eastern, North, and South Shores in Massachusetts offering residential and business plumbing companies.
After presenting the challenges they were going through on the brewery to manufacturers representative Walter F. Morris, they launched him to Saniflo’s commercial line of drain pumps and carry stations. A Morris representative really helpful Saniflo’s Sanicom 2 to handle the drainage for a new bar space. Walter F. Morris also recommended Saniflo’s Sanicubic 2 to handle two unisex restrooms. Down the line, the brewery faced further issues after they needed to add a sink close to the pizza oven per the Health Board’s request and, once more, after they finally started the development of the brand new bar space.
SOLUTION

After learning extra about Saniflo’s Sanicom 2 industrial drain pump and the Sanicubic 2 raise station, O’Leary knew it will clear up the brewery’s unique concrete trenching points.
“The Sanicubic set the usual for the brewery and helped out tremendously, as a end result of we could go from one workers bathroom to offering two bathrooms for the public,” O’Leary explains.
After efficiently opening and offering the required amenities to clients, the brewery needed to add a hand sink near the pizza oven. O’ diaphragm seal explains there were no drain pipes available close sufficient to the oven, so that they needed to find one other Saniflo answer. O’Leary determined to install the Saniswift drain pump, which enabled them to tie into the existing drain line, positioned above the doorway almost 30 ft away from the new hand sink.
Soon after, Revival Brewing and Lost Valley Pizza was ready to start the construction of the new bar area. The bar would include two washing machines, a three-base sink, and ice bins. The new Sanicom 2 served as the plumbing resolution for the bar space. The Sanicom 2 is a heavy-duty duplex drain pump designed for functions requiring grey water elimination for commercial needs.
Recently introduced into the market, the Sanicom 2 comes equipped with a pair of 2-horsepower, 220-volt motors for dealing with multiple business fixtures that should course of giant volumes of high-temperature water, grease or chemical compounds. The duplex drain pump can move as much as a hundred and forty gallons of fluid per minute, with each pumps mechanically activating concurrently when the incoming flow price exceeds that of a single pump.
Other key features of the Sanicom 2 embrace:
Easy access for servicing: The Sanicom 2 has been designed to keep upkeep to a minimal. If servicing is needed, the two motors, electrical elements, pressure-level switches, and dip tubes are all readily accessible and simply eliminated.
Fail-safe activation: A fail-proof sensing mechanism system for detecting the water level contained in the Sanicom 2 consists of three stress switches, every put in in its personal internal dip tube. With three totally different switches, it’s nearly inconceivable for the unit to fail to activate with incoming fluids.
Control Panel: The unit comes equipped with an external wired management panel with override buttons and LED power and alarm indicators. An exterior alarm box is elective.
Nationwide Compliance: IAPMO-listed and carrying the UPC (Uniform Plumbing Code) logo, the Sanicom 2’s duplex expertise is an excellent match for a lot of U.S. locales and jurisdictions.
Like the Sanicom 1 drain pump, the new duplex model can handle fluids as a lot as 194 levels Fahrenheit (90 degrees Celsius), making it ideal for industrial-scale dishwashers, business washing machines, hydroponic crop rising, and any other business and industrial applications requiring wastewater evacuation. With horsepower ratings larger than other Saniflo systems, the Sanicom 2 discharges effluent by way of a 1.5-inch pipe vertically 32 feet and/or horizontally 390 ft. The pump comes geared up with built-in verify valves on the discharge of every motor.
Accommodating the brewery’s new bar, the Sanicom 2 pumps the wastewater from three fixtures 15-feet vertically and then 30-plus-feet horizontally via a 1.5-inch discharge pipe. At a quarter-inch slope per foot, the discharge then runs into the main drain on the opposite facet of the wall.
RESULTS

“Depending upon the length of your run into a drain line, it might take as little as an hour to put in the Sanicom 2,” says O’Leary approvingly. “But it was a twelve-hour job for us on the brewery, because we had a lot of piping to run and had to set up venting.”

According to O’Leary, the set up was very straightforward and went smoothly for him and his group. “We effortlessly linked the drain traces to the pump and installed a shut-off for the ejection facet for upkeep down the road,” he says, adding, “I was amazed how excessive and much the Sanicom 2 is prepared to pump the drain water to the sewer line, yet the unit itself tucks right beneath the bar.”

Besides not obstructing the bartenders or the staff, the Sanicom 2 offers simply accessible electrical hookups, based on O’Leary: “The electrician raved about how simple and straightforward it was to make connections.”

O’Leary reports that “the bar is now up and working, and the owner’s feedback has been unbelievably positive”—thanks in no small half to Saniflo’s heavy-duty commercial drain pumps and lifting station.
CLIENT CLOSE-UP: REVIVAL BREWING COMPANY

Revival Brewing Company is a centered on the brewmaster’s ardour for unique and revolutionary craft beers, cultivated over twenty years of creating signature brews for the preeminent breweries in Rhode Island.
For เพรสเชอร์เกจ , go to www.revivalbrewing.com.
Share

Our Posts