Enerpac has released its RP-70A hydraulic rail stressor and ZC3-Series battery powered stressing pump which provides a cordless, lightweight, zero emission, rail stressor package for rail monitor thermite welding.
Traditional absolutely assembled rail pullers are too heavy for operators to comfortably transport and deploy safely and shortly. The Enerpac RP70A stressor makes use of modular elements that could be assembled and installed on website without the necessity for instruments, making preparation for rail stressing simpler and safer. Assembly usually takes lower than two minutes.
The Enerpac rail stressing package is designed for railway maintenance crews who assemble and set up the rail puller immediately on website when adjusting the hole between rail ends for rail stressing, rail welding, repairing rail failures and servicing insulators. The sturdy, simple meeting components, including Enerpac ZC3-Series pump and hose set, are as a lot as three times lighter than related instruments. The complete package may be transported in an optionally available specifically designed metal transport frame.
weksler ea14 has a 70-tonne pulling and 35-tonne pushing capability whereas holding the rail in impartial length in the course of the thermite welding process.
Share